Tuesday, January 29, 2013

Fully wiring a multi-level home post construction

...is not easy but can be done.

Our home was built in 1995.  It was long before structured wiring was the norm.  I pulled the wire in my last house, which was built in 1961 and I really enjoyed the results.  So I thought "How bad could it be".  But I quickly starting having questions that I was not able to answer.  The last house was a ranch with a crawlspace...very easy.  However, this house is 3 stories with the 3rd story partially finished.  I needed to find a channel that I could pass all the cabling from the second story.  I ended up hiring some home theater installers to help me pull (2) Cat5e and (2) Coax to every room in the house to a large hole in the wall in the front hall closet where I finished off everything in a panel.  We also pulled all new wiring for an old intercom system that I upgraded.  We also added 3 new intercom locations in the process.  All-in-all the project went well.  We were able to pull all the wiring in about 12 hours.  I was paying them by the hour.  I was able to get everything up and running now and I recently upgraded the punch down from 12 Ethernet ports to 24 Ethernet ports.

If you have any questions about the process and any decisions we had to make, let me know.

Monday, January 28, 2013

Why not...

Sometime ago I helped my wife setup a blog.  So I decided started my own to capture all my little projects.  I like cars, big and small.  I play racquetball, table tennis, golf, and other sports.  I also play Trombone with the Raleigh Civic Symphony.  I'm also quite an electronics addict.  I usually have several projects all going at once.  I'll first discuss my house setup in my next post.